"Kanghua Tunnel is almost completed," said the director of Changjiang Road reconstruction on September 24.
With the completion of Kanghua Tunnel, the main line of Changjiang Road was open to traffic on September 26.
The next stage calls for the auxiliary lanes on both sides of Changjiang Road to enter an intense construction period. At the same time, the construction and finishing touches of the remaining 6 underground pedestrian walkways will also be completed.
In addition, Dongxiang Tunnel outside the main line of Changjiang Road has already been completed its main structure and is expected to open to traffic by the end of November.
About Zhongshan News Business Culture Services
Copyright © 2018-2019 Zhongshan Daily Newspaper Group. All rights reserved. Presented by zsnews.cn