Language: English | Chinese
Tue,May,20,2025
Home About Zhongshan News Business CULTURE & EDUCATION Services
HOME > News > Giant pipe section of Shenzhen-Zhongshan Bridge ready for installation
Giant pipe section of Shenzhen-Zhongshan Bridge ready for installation
Updated: 2021-12-09    Source: Zhongshan Daily Large Medium Small Print

zsrb1208A01_006_01.jpg

The "super-heavy and super-long" steel-cased E27 standard pipe section for the Shenzhen-Zhongshan Bridge underwater tunnel left the shipyard on December 6.

The E27 pipe section is 165 meters long, 10.6 meters high, and 46 meters wide. After pouring, it will weigh about 80,000 tons, and will displace the same amount of water as that of a heavy aircraft carrier.

The E27 pipe section will be installed early next year.

About Zhongshan News Business Culture Services

Copyright © 2018-2019 Zhongshan Daily Newspaper Group. All rights reserved. Presented by zsnews.cn