Language: English | Chinese
Sat,May,24,2025
Home About Zhongshan News Business CULTURE & EDUCATION Services
HOME > News > Pipe section E18 of Shenzhen-Zhongshan Bridge tunnel installed
Pipe section E18 of Shenzhen-Zhongshan Bridge tunnel installed
Updated: 2022-04-26    Source: Zhongshan Daily Large Medium Small Print

0426-1.png

After 23 hours and 20 minutes of continuous operation, the E18 pipe section was installed on the Shenzhen-Zhongshan Bridge underwater tunnel on April 24.

So far, the total length of installed pipe sections has reached 3,877.8 meters, exceeding three quarters of the total length of the tunnel.

The Shenzhen-Zhongshan Bridge tunnel will stretch 6,845 meters, 5,035 meters of which is fully immersed underwater. The underwater section consists of 32 pipe sections and 1 final joint.

About Zhongshan News Business Culture Services

Copyright © 2018-2019 Zhongshan Daily Newspaper Group. All rights reserved. Presented by zsnews.cn