Language: English | Chinese
Sun,Jun,08,2025
Home About Zhongshan News Business CULTURE & EDUCATION Services
HOME > News > Concrete box girder prefabrication for Shenzhen-Zhongshan bridge non-navigable span completed
Concrete box girder prefabrication for Shenzhen-Zhongshan bridge non-navigable span completed
Updated: 2022-10-10    Source: Zhongshan Daily Large Medium Small Print

1010-1.jpg

As the last 60-meter-long concrete box girder was slowly removed from the S07 girder fabrication yard of China Railway Major Bridge Engineering Group's Shenzhen-Zhongshan Bridge project, the prefabrication of all concrete box girders for the non-navigable span section of the Shenzhen-Zhongshan Bridge was finished on October 8.

The Shenzhen-Zhongshan Bridge has a total of 155 sixty-meter-long concrete box girders, of which 141 are standard 20-meter-wide girders and 14 are 20- to 24-meter widening girders.

All the box girders used in the non-navigable section are expected to be installed by the end of November.

About Zhongshan News Business Culture Services

Copyright © 2018-2019 Zhongshan Daily Newspaper Group. All rights reserved. Presented by zsnews.cn