Xiangshan 1, the first shield tunneling machine in the Zhongshan section construction of the Nansha-Zhongshan Intercity Railway, started operation on May 31 from the Hengmen shaft to Xiangshan Station.
The Hengmen shaft is situated in Hengmen Community, Nanlang Sub-district. The left shield-driven tunnel section from the Hengmen shaft to Xiangshan Station starts here.
The main part of the shield tunneling machine is ready for operation.
Workers are lifting construction materials at the fore shaft.
A worker is welding to reinforce the battery car track.
The connecting bridge of the shield tunneling machine is 21 meters in length and 30 tons in weight. The picture shows workers debugging the double-track beam.
The workers are reinforcing the reaction frame.
Before operation, the cutter of the shield tunneling machine is just 1.2 meters away from the tunnel portal.
A worker is inspecting the frame connection in the track area.
Joint commissioning of the shield tunneling machine. (Photo by Ming Jian and Miao Xiaojian)
About Zhongshan News Business Culture Services
Copyright © 2018-2019 Zhongshan Daily Newspaper Group. All rights reserved. Presented by zsnews.cn