Language: English | Chinese
Mon,Jan,20,2025
Home About Zhongshan News Business CULTURE & EDUCATION Services
HOME > News > Images: 'Underground dragon' breaks through the soil
Images: 'Underground dragon' breaks through the soil
Updated: 2025-01-14    Source: Zhongshan Daily Large Medium Small Print

As the "Tianhe 498" shield machine broke through the soil from the receiving end portal of the Qijiang Avenue station (former Qijiang New Town station), the first shield construction tunnel of the Nansha-Zhongshan Intercity Railway Zhongshan section, which is 716.2 meters long, was linked up on January 10.

1.jpg

Workers are removing the muck at the tunnel portal.

2.jpg

The slag trucks are transporting the excavated soil away during the tunneling process.

3.jpg

The shield machine is conducting tunneling operation.

4.jpg

A worker is preparing to replace the sealing grease.

5.jpg

Two workers are preparing for the tunnel segments assembly.

6.jpg

Interior of the tunnel.

7.jpg

Making preparations for the tunnel's joining. (Photo by Miao Xiaojian)

About Zhongshan News Business Culture Services

Copyright © 2018-2019 Zhongshan Daily Newspaper Group. All rights reserved. Presented by zsnews.cn