The newly-built Huangshali Grand Bridge, part of the Sanjiao-Huangpu section of Nansan (Nantou-Sanjiao) Highway phase-2 project, opened to 2-way traffic on July 11, with the old bridge closed for renovation.

Spanning the Huangshali Waterway and connecting Sanjiao and Huangpu towns, the 1,098.66-meter bridge is expected to have all lanes on both bridges fully open by the end of August.
About Zhongshan News Business Culture Services
Copyright © 2018-2019 Zhongshan Daily Newspaper Group. All rights reserved. Presented by zsnews.cn