ZIDD always attaches great importance to talent cultivation and scientific research innovation, and it has thorough plans on the promotion of postdoctoral research.
A total of 31 pipe sections, including E1-E22 on the west side and E24-E32 on the east side, have been installed, with a total length of 4,867.8 meters.